Find the partner you need for your safety-critical plastic engineering project
Roperhurst fabricated and installed DW154-compliant PVC/GRP Ductwork to extract fumes and solvent gases from 60 fume cupboards and cabinets.
Plastratum worked with this global aerospace client to deliver an automated NDT plant and associated extraction
Roperhurst designed, fabricated and installed this fume scrubber, fume extract ductwork and discharge stack
IEP fabricated and installed these large fume exhaust stacks at a semi-conductor research facility, proving that functionality can also look fantastic.
Marcol worked in partnership with its client to design, fabricate and install this dosing cabinet, one of many built to deal with a particular chemistry
Fabrication and installation of PVC/GRP ductwork off-site for onward transport to research building, dramatically reducing site installation and risk of clashes.
SCPS Group has installed tank linings using polypropylene, polyethylene, PVDF and GRP in the galvanising, steel, automotive, aerospace and other industries.
Design, fabrication and installation of cleanroom process wetbenches for high purity and chemical resistance using PVDF and polypropylene.
Plastratum provided our automotive client with a bespoke effluent treatment plant, which included this 30,000 litre FBPP/GRP settlement tank.
Full design and fabrication of fabric-back polypropylene discharge stack reinforced with steel support rings and layers of chop glass strand mat.
Design, fabrication and installation of a 4m diameter, 3m tall E-CTFE/GRP (Halar) chemical storage/mixing vessel for an overseas customer to BS4994.
Roperhurst's design & build approach provides a unique fume scrubbing solution for each process, with full site installation service.
Four of Roperhurst's composite access platforms, designed for the rail industry and assembled using the core6 range of products.